GRID IMPACT STUDY

ZTENCO conducts a thorough examination of grid connection scenarios and power systems includes load flow analysis, short-circuit current study, dynamic study, etc. assisting you in optimizing the electrical interconnection facilities of your power plant to comply the statutory requirements. Our expertise adds value to your project by ensuring compliance with the regulations and requirements of the interconnecting utility. Our study complies with the national electricity grid codes, electrical distribution codes, and the electricity act.

Execution & Analysis Highlights

Service breakdown analysis graphic
Service breakdown analysis graphic
Service breakdown analysis graphic

Project Footprints

6 Tracked

Grid Impact Study for Pabna 64MW Solar Park Project of Bangladesh China Renewable Energy Company Limited (BCRECL)

Scope: Technical Services of System Study for Grid Integration of Pabna 64MW Solar Park Project as per the following scope_of_services: “A Detailed Grid Impact Study including Voltage Control, Frequency Control, Reactive Power Compensation, Harmonic Compensation, Fault Ride Through Control, Active Power Curtailment, Short Circuit Study, etc. complying with Electricity Grid Code, PPA And IA Requirements.”

Grid Impact Study for Sirajganj 68MW Solar Park Project of Bangladesh China Renewable Energy Company Limited (BCRECL)

Scope: A Detailed Grid Impact Study including Voltage Control, Frequency Control, Reactive Power Compensation, Harmonic Compensation, Fault Ride-Through Control, Active Power Curtailment, Short Circuit Study, etc. complying with National Electricity Grid Code, PPA and IA requirements.

Grid Impact Study for Cox's Bazar 60MW Wind Power Plant Project

Scope: Steady State Analysis: Load Flow Study, Short Circuit Study, Contingency Study, Reactive Power Compensation; Dynamic Analyses: Transient Stability, Fault Ride-Through Control, Active Power Curtailment, Low Voltage Ride Through, Frequency Response; Power Quality Analysis: Harmonics Analysis at POI;

Grid Study for the proposed 50MW Solar Power Plant Project of Scatec Solar ASA, Norway

Scope: Task 1: Preliminary load flow analysis (Grid Load Flow Study / Steady State Analysis); Task 2: Detailed Design Analysis (Data Collection and Network Modelling; PV Facility Load Flow Study / Steady State Analysis; Power Factor Analysis / Reactive Power Capability; Short Circuit Study; Insulation co-ordination study; Dynamic Stability Analysis; Harmonic Analysis; Long Term Flicker Analysis; Task 3: Grid Code Compliance Electrical Study; Task 4: Grid Code Compliance Testing.

Grid Interconnection Study of Patuakhali 1320MW Coal Based Power Plant Project of RNPL

Scope: Load flow study at different scenarios, Short Circuit Study, Dynamic power system model building of the proposed power plant including all power plants connected to Patuakhali Power Generation Hub.

Grid Interconnections Study for proposed 1200MW RLNG Based Combined Cycle Power Plant Project as IPP.

Scope: Load flow study at different scenarios, Short Circuit Study, Dynamic power system model building of the proposed power plant including all power plants connected to Matarbari/ Magnama Power Hub, Plant performance under different contingencies, etc.