As a technical service provider, ZTENCO guarantees the delivery of dependable and comprehensive technical and financial feasibility study reports, serving as a solid foundation for your decision-making process. We offer integrated feasibility study and due diligence services that encompass technical, environmental, sustainability, and commercial considerations. Our holistic approach is designed to significantly enhance the operation and value of your projects.
Execution & Analysis Highlights
Project Footprints
15 TrackedConsultancy Services for Supporting the Adoption of Digital Solutions for Electricity Load Forecasting
Scope: Support DPDC in adopting digital solutions for short-term electricity load forecasting to enhance grid management efficiency and integration of renewable energy sources under GIZ. For this purpose, the activities done are: System Review & Pilot Area Selection; Data Preparation & Model Framework Design; Pilot implementation & Performance Validation; Capacity Building, Engagement & Knowledge Transfer, etc.
In-depth Monitoring of the Construction of Commercial Building near KDA Market (1st Revised) (Package No. SR-43). A project under the Ministry of Housing and Public Works
Scope: In-depth monitoring of procurement, quality of work, project delay (if any), increase of project cost, project risk, preparation of SWOT analysis, field level visit and survey, reporting, etc.
In-depth Monitoring of “Upgradation of Kushtia (Trimohani)-Meherpur-Chuadanga-Jhenaidah (R-745) Regional Highway from Kushtia – Meherpur to proper standard and width (1st Revised).” A project under the Roads and Highways Department.
Scope: In-depth monitoring of procurement, quality of work, project delay (if any), increase of project cost, project risk, preparation of SWOT analysis, field level visit and survey, reporting, etc.
Consultancy Services as Consultant (Energy) of “Review & Update of Nawabganj Upazila (Package No.: UTMIDP/UMPR-2) Development Plan (Master Plan) under “Upazila Town (Non-Municipal) Master Plan Preparation and Basic Infrastructure Development Project (UTMIDP)”, LGED
Scope: Prepare Survey Questionnaires, Conduct surveys, prepare energy inventories, develop sustainable energy management plans, suggest/design energy infrastructure, prepare reports, etc.
Detailed Technical & Financial Feasibility Study (Part B) for Enhancement and Strengthening of Power Distribution System of Cumilla and Mymensingh Zone, BPDB
Scope: Conduct a detailed feasibility study to identify and justify the future demand of electricity, a modern & sustainable electricity distribution network for BPDB's Distribution Central Zone of Cumilla and Mymensingh. It included capacity assessment of existing and determination of new of 33/11kV substations and of 33kV, 11kV, 11/0.4kV and 0.4kV lines and 11/0.4kV distribution transformers in the project area.
In-depth Monitoring of the "Development of Bhola (Parantalukdarhat)-Charfashan (Charmanika) Regional Highway." A project under the Roads and Highways Department.
Scope: In-depth monitoring of procurement, quality of work, project delay (if any), increase of project cost, project risk, preparation of SWOT analysis, field-level visit and survey, reporting, etc.
In-depth Monitoring of the “Construction of 34 nos. Buffer Godown at Different Places of the Country for Facilitating Fertilizer Reservation and Distribution (1st Revised)” Project under the Ministry of Industries. (Package No.SR-27)
Scope: In-depth monitoring of procurement, quality of work, project delay (if any), increase of project cost, project risk, preparation of SWOT analysis, field-level visit and survey, reporting, etc.
Consultancy Services as Consultant (Energy) for Preparation of Monoharganj, Lalmai and Gowainghat Upazila (Package No.: UTMIDP/UMPP-2) Master Plan under ""Upazila Town (Non-Municipal) Master Plan Preparation and Basic Infrastructure Development Project (UTMIDP)"", LGED.
Scope: Prepare Survey Questionnaires, Conduct surveys, prepare energy inventories, develop sustainable energy management plans, suggest/design energy infrastructure, prepare reports, etc.
Consultancy Services as Consultant (Energy) for Preparation of Mithamain and Atpara Upazila (Package No.: UTMIDP/UMPP-1) Master Plan under ""Upazila Town (Non-Municipal) Master Plan Preparation and Basic Infrastructure Development Project (UTMIDP)”, LGED.
Scope: Prepare Survey Questionnaires, Conduct surveys, prepare energy inventories, develop sustainable energy management plans, suggest/design energy infrastructure, prepare reports, etc.
In-depth Monitoring of the “Construction of Narsingdi District Jail.” A Project under the Ministry of Home Affairs. (Package: SR-25)
Scope: In-depth monitoring of procurement, quality of work, project delay (if any), increase of project cost, project risk, preparation of SWOT analysis, field-level visit and survey, reporting, etc.
Feasibility Study for Electrical Interconnection Facility (EIF) and Gas Transportation Facility (GTF)
Scope: The objective of this study is to analyze the necessity and feasibility of the project and examine the following items: Project cost, Implementation plan, Procurement package, Technical and engineering analysis, Alternative or Option analysis, Financial and Economic Analysis,
Load Factor Analysis Consultant for 660MW Combined Cycle Gas Turbine Power Plant in Bangladesh
Scope: Desktop study and to identify the expected year-wise Load Factor and Merit order of Gazaria 660MW CCGT Power Plant from 2026 to 2035 in Bangladesh
Feasibility Study and Preparation of Project Profile of a 5 MW Biomass Power Plant Project
Scope: Detail Feasibility Study, Site Evaluation, Biomass (Rice Husk) Sourcing and Transportation, Power Evacuation, Technology, Financial Analysis, etc.
Technical and Financial Feasibility Study; Design and Drawings of Electrical Distribution Network; Design and Drawings of Gas Transmission Network - of Jolshiri Abashon Project
Scope: Preparation of Technical and Financial Feasibility Study Report; Preparation of Detailed Design & Drawings, BOQ and Technical Specifications for Electrical Distribution System Network and Gas Transmission System Network of Jolshiri Abashon Project.
Consultancy Services for Pre-Feasibility and Feasibility Study of Madhumati 100MW HFO Based Power Plant Project
Scope: Detail Feasibility Study, Site Evaluation, HFO Sourcing and Transportation, Power Evacuation, Technology, Financial Analysis, etc.